Jay J asked:
The water must be pumped out of corralville lake into a water truck, transported 1 mile south on hwy 965 to the BP terminal on the east side of the road and pumped into a newly constructed 75 foot diameter, 48 foot tall tank. This operation should be continued until the tank is full. The hydrotest will last 24 hours. After 24 hours the water will be drained out of the tank onsite.